Soil Pre-Treatment

Our soil pre-treatment for new construction typically takes at least two applications, depending on the type of structure.At Guarantee Pest Control of Lexington, Inc., our soil pre-treatment comes with a five-year guarantee after the completion of treatment. Our soil pre-treatment for new construction typically takes at least two applications, depending on the type of structure. 

Concrete slab structures must be treated before the concrete is poured, and before the plastic and wire are put in place. Crawlspace structures can be treated once the foundation is complete.  Treatment is done next to the foundation inside and out, and around the support piers. 

The second phase to any pre-treatment is when the back fill is completed around the outside of the structure and before any attached concrete slabs are poured. This ensures there is a consistently treated zone around the outside of the structure.